top bg

2020 Roadway Rehabilitation Project

Due to the current social distancing guidelines recommended by Governor Walz, the City of Woodbury will not be hosting an in-person meeting for the 2020 Roadway Rehabilitation project. Instead, please watch the presentation below to learn about construction operations and proposed project phasing. Any questions related to specific construction items should be directed to the project hotline at 612-430-2805.
 

About the Project

2020 Roadway Rehab Areas (Click to Enlarge)
Street and utility improvements are made on an annual basis in different areas of the city as part of the Roadway Rehabilitation Project. In 2020, improvements will be made in the Brookside/Savanna Oaks North/Woodbury Crossing neighborhoods as well as along Woodlane Drive and Wooddale Drive (select the map, left).

Sign up for InTouch email notifications
Sign up to receive project updates via the city's InTouch email notification system. Be sure to select the "Roadway Rehabilitation 2020" list.

Sign Up for InTouch

Questions regarding the project can be directed to Mike Hejna,     Engineer I, by calling 651-714-3593 or michael.hejna@woodburymn.gov

See below for important documents regarding the 2020 Roadway Rehabilitation Project, including handouts, maps, letters and presentations. 

Brookside/Savanna Oaks North/Woodbury Crossing Area

Project Updates

Past Meetings